The gymnasium’s steel-frame roof presented a design challenge. In addition to the numerous obstructions, the diffusion plane was nearly 56 feet (8 m) above the ground. The 750 DS Daylighting System overcame both those challenges. First, it allowed daylight to be transmitted over 26 feet (8 m) to avoid construction obstacles. Second, the high performance design provided ample natural light, which was evenly distributed throughout the space. Overall, the daylighting design succeeded in achieving its aesthetic, functional and environmental goals.