As plans were developed for the new facility, incorporating daylight into the school’s gym became a main objective. Administrators wanted students to benefit from exposure to natural light during the school day while reducing the building’s electricity use. This posed a problem, however, because the gym was designated for an interior location with no access to the outside.
The original strategy was to install traditional skylights, but concerns about adequate illumination and hot spots prompted the architect to seek other options.